Availability
Did the equipment run when you planned?
Compare run time with the time scheduled for production.
Run time ÷ Planned production time
Understand what is limiting output. TEXVIA connects production data, equipment and operational workflows to help your teams identify losses, focus improvement efforts and track progress.
OEE measures how effectively planned production time becomes good output at the ideal production rate. It brings time, speed and first-pass quality into one measure.
Look at the three factors together to understand where productive time is being lost.
Did the equipment run when you planned?
Compare run time with the time scheduled for production.
Run time ÷ Planned production time
Did production run at its ideal rate?
Compare actual output during run time with the output possible at the ideal cycle time.
(Ideal cycle time × Total count) ÷ Run time
Was the output right the first time?
Compare first-pass accepted output with total output. Scrap and items needing rework are quality losses.
Good count ÷ Total count
Calculation method: Vorne’s guide to OEE formulas and definitions ↗
Adjust a factor to see how the combined OEE changes. Keep an eye on all three: an improvement in one can be offset by a loss in another.
Enter each factor as a percentage from 0 to 100.
A score becomes more useful when you can investigate its causes. Agree consistent loss reasons and a threshold for separating minor stops from downtime.
Breakdowns, faults and other interruptions to scheduled production.
Preparation, product changes and adjustments during planned production time.
Repeated short interruptions such as jams, misfeeds or sensor issues.
Equipment running below the ideal production rate.
Scrap and rework during established production.
Rejected output while the process starts or stabilises.
Loss framework: Vorne’s six big losses ↗
Connect engineering, manufacturing systems and daily working practices around a defined production challenge. We shape the scope around your equipment, available data and improvement priorities.
Agree production calendars, equipment boundaries, ideal rates, counts and loss reasons before designing the dashboard.
Bring machine states, counters and process information together through PLC, SCADA, historian and MES integration.
Give operators and supervisors a readable view of production, downtime and the factors behind OEE.
Review recurring stops, changeovers and speed losses with the context needed to investigate them.
Connect performance with products, orders and schedules through the MES and business-system interfaces in your scope.
Establish a validated baseline, prioritise actions and review changes in the underlying losses with your team.
A focused first line or process creates a practical place to agree definitions, check the data and establish a useful improvement routine.
Agree the business question, production boundary and measurement rules.
Capture equipment information and add essential operator context.
Check counts, timing, ideal rates and downtime classifications against the process.
Use loss reviews to choose actions and track what changes.
Extend the approach as the data and working practices become established.
Clear definitions and reliable data make performance discussions more useful.
Further reading: Vorne’s OEE questions and guidance ↗
Set a target around your own process and improvement priorities. Product mix, changeover frequency and operating conditions matter. Compare consistent measures and review output, quality and delivery alongside OEE.
A changeover inside planned production time reduces Availability. Document the production calendar and classification rules so the same event is treated consistently.
OEE measures effectiveness within planned production time. Utilisation measures how much of the available calendar is scheduled for production.
We start by assessing available equipment signals, data platforms and integration options, then define the additions and interfaces needed for your project.
Tell us about your process, current reporting and improvement priorities. Let’s define a practical route from visibility to action.
Discuss an OEE project